  • Virginia Avenue Playground Improvements - Washington DC
    The Federal Emergency Relief Administration (FERA) and the Civil Works Administration (CWA) funded improvements at the Virginia Avenue Playground in Washington DC. Today, the sire is called Virginia Avenue Park. The work consisted of the following improvements: CWA and FERA, 1933-1934, “Graded, fenced, running track 90 percent complete, old pavilion removed; roof reshingled, electric lights installed.” (Report of the Government of the District of Columbia 1935) FERA, 1934-1935, “Completed running track.” (Report of the Government of the District of Columbia 1936)
  • McMillan Playground Improvements - Washington DC
    The Federal Emergency Relief Administration and the Works Progress Administration (WPA) funded improvements at the McMillan Playground in Washington DC. Completed between 1935 and 1938, the work consisted of “Fencing (2,400 feet, 8-foot); completed installation of drainage system.” The WPA completed the following work: 1935-1936, “new recreation building, begun under Civil Works Administration, carried forward to 70% completion; 4 tennis courts subgraded; grading 500 cubic yards.” (Report of the Government of the District of Columbia  1936) Federal Art Project, 1935-1936, “A fine set of murals depicting games of the eighteenth century has been carved in wood and painted for the McMillan playground house…” . (Report of...
  • Happy Hollow Playground - Washington DC
    The Civil Works Administration and the Federal Emergency Relief Administration (FERA) funded improvements at the Happy Hollow Playground in Washington DC. A wading pool was installed. In 1934-1935, FERA, “esurfaced one tennis court; painted house.”
  • Palisades Interstate Park: Henry Hudson Drive - Alpine NJ
    The Henry Hudson Drive provides access to sections of the Palisades Interstate Park in New Jersey located on the banks of the Hudson River. The section of the drive from the Englewood Cliffs entrance to the Edgewater entrance were built by New Deal laborers.  (A section to the north of this portion precedes the New Deal.) Three New Deal agencies—the Civil Works Administration, the Civilian Conservation Corps, and the Works Progress Administration—were involved in the construction of the road. Further north, the Alpine Approach Road and its retaining walls in the northern section of the park were also built by New Deal...
  • Montrose Park Playground - Washington DC
    The Federal Emergency Relief Administration funded improvements at the Montrose Park Playground in Washington DC between, 1934-1935. The work consisted of “egraded basketball and volley ball courts.”  
  • Rock Creek and Potomac Parkway: Paths and Foot Bridges - Washington DC
    At the same time as the New Deal completed the Rock Creek and Potomac Parkway, it extended the system of trails south from Rock Creek Park (a separate park unit) into the parkway.  All such paths were converted to general purpose walking and biking trails in the 1970s. The Civilian Conservation Corps (CCC) built more than two miles of bridle paths in both Rock Creek Park and the Rock Creek and Potomac Parkway.  This work was done under supervision of the National Park Service, which had gained oversight of all DC parks in 1933. The Public Works Administration (PWA) paid for the replacement...
  • Reno Road NW Improvements - Washington DC
    Federal Emergency Relief Administration (FERA) improved a segment of Reno Road NW, from Rodman Street to Chesapeake Street. “This dirt road was given an improved surface: “Old material from replacement jobs is hauled to the , broken by hand, and then rolled. After rolling, the pavement is treated with a bituminous material.” Note: The DC Government annual report credits this work to the Public Works Administration (PWA), but based on previous reports of similar work, and particular wording used, for example, “Public Administration forces,” we believe that this project was more likely carried out by the Work Division of the Federal Emergency...
  • Benning Road SE Improvements - Washington DC
    The Federal Emergency Relief Administration (FERA) made improvements to Benning Road SE in Washington DC, from Central Avenue to Hillside Avenue. This dirt road was given an improved surface: “Old material from replacement jobs is hauled to the , broken by hand, and then rolled. After rolling, the pavement is treated with a bituminous material.” Note: The DC Government annual report credits this work to the Public Works Administration (PWA), but based on previous reports of similar work, and particular wording used, for example, “Public Administration forces,” we believe that this project was more likely carried out by the Work Division of...
  • Kalmia Road NW Improvements - Washington DC
    The Federal Emergency Relief Administration (FERA) made improvements to a segment of Kalmia Road NW,  from Eastern Avenue to Georgia Avenue. This dirt road was given an improved surface: “Old material from replacement jobs is hauled to the , broken by hand, and then rolled. After rolling, the pavement is treated with a bituminous material.” Note: The DC Government annual report credits this work to the Public Works Administration (PWA), but based on previous reports of similar work, and particular wording used, for example, “Public Administration forces,” we believe that this project was more likely carried out by the Work Division of...
  • Ceasar Cone Elementary School - Greensboro NC
    Elementary school built in 1935 with funding from the Public Works Administration and Proximity Manufacturing Company for the White Oak New Town mill village community founded by the Cone Mills Corporation, then among the largest denim manufacturers in the world. Still in use as an elementary school today.