• St. George School - St. George UT
    The Public Works Administration funded the construction of the St. George School in St. George, Washington County School District. Docket # 1223-R (Utah). The exact location and condition of this facility is unknown to the Living New Deal.
  • Water System - St. George UT
    A waterworks construction project in St. George, Utah was undertaken with the aid of federal Public Works Administration (PWA) funds. The PWA supplied a $101,500 loan and $41,300 grant toward the $152,499 total cost of the project. Work occurred between January 1936 and July 1937. (PWA Docket No. UT 1578)