• Hurricane Reconstruction - Walpole NH
    Extensive reconstruction was accomplished in Walpole by the W.P.A. after the hurricane of 1938. 1938 Watkins Hill Road Total, $1,000 00 2,650 ft. of road completed. 4 culverts installed. 2 miles of roadsides brushed and burned. W. P. A. labor used on this road. W.P.A. Fund Total, $499 49 This fund was used for gravelling mud-holes and clearing roadsides and to carry on W. P. A. projects. $3,500 00 Ash street: 640 ft. tile laid. 3 manholes built with old ones hooked on. Pine and Spruce streets: 751 ft. tile pipe laid. 7 man holes built with old ones hooked on. W. P. A. furnished labor used on these streets. March Hill Road Total, $1,072 85 2,800 ft. of road built. 6...