Sandy River Road - Norridgewock ME The WPA helped with work on the Sandy River Road according to the town reports. An unspecified PWA funding for a road is mentioned.
1936
Sandy River Road, WPA ..........$1,250.00
Refund, Solon Lumber Co. 3rd Class roads, PWA ....$57.33
Refund, Horace Reed, 3rd Class roads, PWA
Amount raised at town meeting....$1,250.00
Payroll: Albert Blaisdell, Bowman Hardware, Henry Desmond, W.F. French, Miller and Jones, New England Metal Culvert Co. Proctor and Bowie, Milford Tibbetts ...$1,360.20
1937
Amounts Raised at Annual Town meeting
Sandy River Road (WPA) $1,250.00
1939
Fredrick Smith, use of car, time spent in WPA certification, cash paid for out of town expenses, postage, tolls, and assembling payrolls (road)...